Project name: High-carbon ferrochrome technological transformation project

Construction unit: Xuzhou Taixin Ferroalloy Co., Ltd.

Construction site: Datun Town Industrial Park, Pei County, Jiangsu, in the original factory area of Xuzhou Taixin Ferroalloy Co., Ltd.

Project nature: reconstruction

Construction scale and content:

(1) Civil engineering: the project utilizes the original land of the enterprise without adding new land. The total land area of the project is 150 mu (about 100000.5 square meters), and the total construction area is 69,200 square meters, of which the newly built construction area is 53,800 square meters (including: finished product workshop 5000 square meters) , Pouring workshop 5000 square meters, smelting workshop 5000 square meters, sintering workshop 6000 square meters, raw material workshop 28800 square meters, environmental protection control room 4000 square meters), using the original building area of 8800 square meters (including: transformer substation 800 square meters, comprehensive office building 8000 square meters) .

(2) Equipment purchase and installation project: purchase and install 252 sets (sets) of main production equipment including submerged arc furnace and sintering machine, and purchase 18 sets (sets) of testing and test equipment.

(3) Supporting projects: the construction of supporting projects such as water supply and drainage, power supply and distribution, and roads within the factory area, and implement measures such as energy conservation, environmental protection, and fire protection.

Construction period: 2 years

Total project investment: 338,885,300 yuan, of which: construction investment is 292.5019 million yuan, and current capital is 46,383,400 yuan.

Fund raising: all project funds are raised by the enterprise itself.

Project Contact: Shao Mingyang

Contact number: 13626177777

1.2 Overview of the construction unit

Company Name: Xuzhou Taixin Ferroalloy Co., Ltd.

Address: Datun Town Industrial Park, Pei County

Legal representative: Shao Biao

Registered capital: 6 million yuan

Company type: Limited company (wholly owned by a natural person)

Date of establishment: December 21, 2009

Business period: December 21, 2009 to December 20, 2019

Business scope: ferroalloys, chromium and chromium alloys, aluminum and aluminum alloy materials, mining machinery parts, iron and steel castings processing and sales, metal and metal mine sales, rare earth metal alloy manufacturing and sales, rare rare earth metal rolling processing and sales. (Projects that are subject to approval in accordance with the law can only be carried out after approval by relevant departments)

company profile:

Xuzhou Taixin Ferroalloy Co., Ltd. is located in the Industrial Park of Datun Town, Pei County. It has 98 employees and covers an area of 150 acres. It has 5 workshops, including a machine repair factory (machine repair and processing equipment such as lathes, planers, and milling machines). The plant area is more than 18500 square meters. The company is mainly engaged in the processing of mining machinery parts and steel castings. The company has 11 departments including finance department, personnel department, marketing department, business department, management department, technology department, production department, purchasing department, logistics department, research and development department and quality assurance department.

1.3 Report preparation basis, principles and research scope

1.3.1 Principles of report preparation

This report is guided by product market demand, focusing on corporate economic benefits, and adopts advanced, applicable and mature technologies to reduce corporate costs and improve market competitiveness.

The main project and environmental protection, energy conservation and industrial hygiene are considered at the same time to reduce pollution and eliminate the harm of factory production to the environment and the health of employees.

1.3.2 The main basis for preparing the report

(1) Relevant national and provincial policies, laws and regulations;

(2) Current relevant technical specifications, regulations, and regulations;

(3) "Guide for Feasibility Study of Investment Projects" (published by China Electric Power Press);

(4) "Industrial Structure Adjustment Guidance Catalog (2011 Edition)" (revised in 2013);

(5) "Guiding Catalogue of Jiangsu Province Industrial and Information Industry Structure Adjustment" (2012 edition);

(6) "Access Conditions for Ferroalloy Industry" (revised in 2008);

(7) "Indices for Control of Construction Land for Industrial Projects" (Guo Tu Zi Fa [2008] No. 24);

(8) "Indices for Construction Land in Jiangsu Province" (2010 edition);

(9) "Outline of the Twelfth Five-Year Plan for the National Economic and Social Development of the People's Republic of China" (2011-2015);

(10) "Outline of the Twelfth Five-Year Plan for National Economic and Social Development of Jiangsu Province" (2011-2015);

(11) "Outline of the Twelfth Five-Year Plan for National Economic and Social Development of Xuzhou City" (2011-2015);

(12) "Outline of the Twelfth Five-Year Plan for National Economic and Social Development of Peixian County" (2011-2015);

(13) The letter of entrustment signed by the construction unit and our company;

(14) Original design materials and other basic materials provided by the construction unit.

1.3.3 Scope of report preparation

The technical and economic analysis and demonstration of the project are mainly based on the following points:

(1) The background of the project proposal and the necessity of construction;

(2) Market analysis;

(3) Construction scale and product plan;

(4) Construction site and construction conditions;

(5) Technical plan, equipment plan and engineering plan;

(6) Supply of main raw materials and fuels;

(7) General plan transportation and public works;

(8) Energy saving;

(9) Environmental impact assessment;

(10) Labor hygiene and fire protection;

(11) Enterprise organization and human resource allocation;

(12) Project implementation progress;

(13) Investment estimation and financing plan;

(14) Financial evaluation;

(15) Project social stability analysis;

(16) Research conclusions and recommendations.